Our nation’s electric grid is a patchwork of local generation, transmission and distribution systems that has been called the world’s largest machine. It takes order and collaboration to keep all parts of the grid working together.

Two regulatory bodies, the Federal Energy Regulatory Commission and North American Electric Reliability Corp., help oversee the grid, set standard practices and create a foundation for future growth.

What is FERC? The Federal Energy Regulatory Commission, known as FERC, is an independent federal agency similar to the Federal Trade Commission and NASA.

FERC oversees how energy moves across the country by high-voltage power lines or large pipelines. FERC has authority over the transmission and wholesale of electricity in interstate commerce. It helps regulate the interstate commerce of natural gas and oil and the siting of natural gas and hydropower facilities.

FERC likely doesn’t regulate your local utility directly, but it does have authority over all wholesale electricity markets where utilities buy power. By setting the transmission rates electric power companies and utilities must pay, the federal agency ultimately influences retail prices.

While state utility commissions have more immediate control over co-op operations and building power lines, the federal agency’s influence fills in the gaps.

“State regulation over co-ops is like Swiss cheese—there are many holes where states don’t regulate,” says Mary Ann Ralls, National Rural Electric Cooperative Association senior director, regulatory counsel. “FERC’s authority is akin to a buffet—a handful of co-ops are subject to the entire scope of regulation, while the vast majority of co-ops must focus on a few items.”

FERC’s regulations aim to maintain fair prices within the wholesale electricity markets run by six regional transmission organizations and independent system operators. These FERC-regulated regional transmission organizations and independent system operators manage smaller sections of the national electric grid. FERC also monitors these markets for energy supply manipulation that can raise prices. When things go wrong, the commission can investigate and levy penalties. Because it’s a public agency, all FERC’s final decisions can be challenged in court.

Overall, FERC sides with conserving energy and encourages utilities to find ways to reduce demand, which eventually can help lower monthly bills. When it comes to grid reliability, the buck stops with FERC.

What is NERC? The North American Electric Reliability Corp. is the official watchdog of the North American bulk power system—the physical infrastructure that generates and transports electricity. It sets mandatory reliability standards for all users, owners and operators of the electric transmission grid, including utilities and energy producers.

The country’s electric grid, with its hundreds of thousands of miles of high-voltage power lines, is often described as a bowl of spaghetti. Yet the lights come on 99.9% of the time you flick a switch. A portion of the gratitude for that reliability goes to NERC.

FERC guides NERC. NERC became the country’s electric reliability organization after Congress called for a single point of contact following the historic blackout of Aug. 14, 2003, which left more than 50 million people in the Northeast and parts of the Midwest without electricity for up to several days.

FERC can require NERC to set new reliability standards or update current rules as needed to protect the grid’s ability to serve today’s increased demand.

Each summer and winter, NERC releases seasonal grid assessments evaluating whether electricity supply is sufficient to meet expected demand and highlighting regions at risk of shortfalls.

These reports analyze conditions that can increase demand, such as heat waves and severe cold, as well as factors that can constrain generation, including fuel or equipment shortages. They also include recommendations to address current risks and help prevent future problems. When unforeseen threats emerge, NERC issues special assessments as needed.

Every year, NERC provides a long-term grid assessment looking ahead a decade at what innovations or circumstances may affect the reliability of our interconnected electric energy transmission network. Providing the electric power industry with timely insight into grid reliability, potential power shortfalls and strategies to address them is essential to keeping the lights on.

NERC also works to train and protect the industry. It holds workshops, technical conferences and training for industry personnel on how to maintain a secure grid. It audits owners and operators of the bulk power system to ensure they meet all reliability standards. It also operates the 24/7 Electricity Information Sharing and

Analysis Center that provides the power industry with the latest information on cyber threats, trends and possible solutions with alerts and advisories. E-ISAC also develops cyber and physical grid security exercises.

For the most part, NERC does not regulate local utilities. Instead, state agencies oversee the distribution power lines that deliver electricity to your home and surrounding communities. But NERC’s authority over the bulk power system is critical to maintaining reliability in every part of the country, including the most rural areas.

What to Remember FERC

  • Regulates how energy is transported • Oversees wholesale energy markets • Supports grid reliability

NERC

  • Is a watchdog for physical energy equipment and infrastructure • Provides short- and long-term grid assessments • Holds training workshops and conferences
The Federal Energy Regulatory Commission’s authority over building generation is limited to approving, licensing and inspecting hydropower plants. PHOTO COURTESY OF THE NATIONAL RURAL ELECTRIC COOPERATIVE ASSOCIATION